Complete co-op renovation in NYC apartment by Melani General Contractor
Co-op & Condo Renovation · All Five Boroughs

Co-op and Condo Renovation in New York City

Melani General Contractor specializes in co-op and condo renovation projects across all five boroughs. Our licensed team understands the unique requirements of managed buildings — from alteration agreement submissions and board approval processes to building-mandated work hours, elevator reservations, and common area protection. Whether you need a complete gut renovation or targeted updates to your kitchen and bathroom, we manage every phase from initial board submission through final DOB inspection. Call (718) 283-4154 to schedule your free on-site estimate.

NYC Licensed GC #626219
Alteration Agreements Handled
$1M–$2M Insurance Limits
Recent Work

Before and After in Managed NYC Buildings

Board-approved construction, executed inside building work hours with protected common areas — from dated post-war units to finished high-rise interiors.

Co-op renovation NYC before photo — dated post-war apartment with parquet floors and original kitchen pass-throughBefore
Post-war co-op living room before renovation: original parquet, textured ceiling, and a closed kitchen pass-through.
Complete co-op renovation in NYC apartment by Melani General Contractor with open layout and new wide-plank flooringAfter
After: open layout, sound-rated wide-plank flooring, new recessed lighting, and full skim-coat finishing.
Board-approved co-op renovation NYC construction with padded elevator and protected hallway in a managed building
Elevator padding, masonite hallway protection, and dust barriers installed before demolition begins.
Condo bathroom renovation NYC with cast iron stack coordination and waterproofing membrane
Bathroom rough-in coordinated with the building's shared stack, then waterproofed to protect neighboring units.
Condo kitchen renovation in a Manhattan high-rise with new cabinetry, quartz counters and building-approved appliances
Condo kitchen renovation in a Manhattan high-rise: new cabinetry, quartz counters, building-approved appliances.
What We Do

Our Co-op and Condo Renovation Services

Each scope below is delivered under one general contract, with board submissions, licensed trades, filed permits, and schedules built around your building's rules.

Alteration Agreement Management

Every co-op and condo renovation begins with the board approval process. We prepare complete alteration agreement packages so your submission clears review without repeated revision requests.

  • Architectural plans coordinated with your architect or ours
  • Contractor insurance certificates (general liability and workers' comp)
  • Detailed scope of work descriptions
  • Construction schedules with start and end dates
  • Noise mitigation protocols
  • Common area protection specifications

Kitchen Renovation in Managed Buildings

Kitchen remodeling in co-ops and condos requires coordination with building plumbing stacks, adherence to appliance specifications (many buildings restrict gas ranges), and compliance with noise restrictions during construction. We redesign layouts, install custom cabinetry, and upgrade countertops while maintaining building management approval at every stage.

More on Kitchen Remodeling

Bathroom Renovation with Stack Coordination

Bathroom renovations in managed buildings demand coordination with shared plumbing stacks for water shutdowns, proper waterproofing to protect neighboring units, and building-approved materials. We install walk-in showers, modern vanities, and heated floors while scheduling plumbing tie-ins around building-mandated access windows.

More on Bathroom Renovation

Electrical Panel Upgrades

Many older co-ops and condos have insufficient electrical capacity for modern appliances and technology. We install 200-amp panel upgrades, dedicated circuits, and GFCI protection while coordinating with building electricians for service entrance modifications and meter work.

More on Electrical Services

Flooring with Sound Attenuation

Most co-op and condo buildings require specific sound transmission ratings (STC/IIC) for new flooring installations. We install hardwood, engineered wood, and luxury vinyl plank with proper sound-dampening underlayment that meets or exceeds building requirements — and we provide test reports for board review when required.

More on Flooring Installation

Full Gut Renovation

Complete interior demolition and reconstruction in managed buildings requires careful planning, staging, and communication with building management. We handle debris removal scheduling, elevator padding, common area protection, and construction hour compliance while delivering the same quality results as any gut renovation project.

More on Gut Renovation

Renovating a whole unit rather than a single room? See our apartment renovation services, or review plumbing and electrical scopes that frequently accompany board-approved work.

Cost

How Much Does a Co-op or Condo Renovation Cost in NYC?

Co-op and condo renovation costs in New York City include standard construction expenses plus building-specific administrative costs. Here are general ranges based on our project history.

Cosmetic Update
Paint, fixtures, hardware
$15,000–$30,000
Mid-Range Remodel
Kitchen, bathroom, flooring
$50,000–$120,000
Full Gut Renovation
Layout changes, all new systems, custom finishes
$150–$400+ / sq ft

Co-op and condo-specific cost factors

  • Alteration agreement filing fees charged by the building (typically $500–$5,000+)
  • Building-required insurance minimums (often $1M–$2M general liability)
  • Architect or engineer review fees required by some buildings
  • Building-mandated work hours that extend project timelines
  • Elevator reservation fees and common area protection deposits
  • Required post-renovation inspections by building engineers

We provide itemized estimates that separate construction costs from building-related administrative expenses so you can budget accurately — including line items for flooring underlayment and sound testing when your board requires it.

Condo kitchen renovation in a Manhattan high-rise completed by Melani General Contractor
Board Approvals

Navigating the Co-op and Condo Board Approval Process

Board review is where most NYC renovations stall. We prepare submissions the way managing agents expect them, then run construction inside the rules the approval sets.

What's Required for Board Approval

Most NYC co-op and condo boards require: a detailed scope of work, architectural plans (for structural or layout changes), contractor insurance certificates, a construction schedule with start and end dates, noise mitigation plans, and common area protection specifications. Some buildings also require a refundable security deposit and neighbor notification letters.

How We Streamline Approvals

Our team maintains pre-formatted submission packages that we customize for each building's requirements. We've worked in hundreds of managed buildings across all five boroughs, so we often know a building's specific requirements before the first board meeting. When revisions are requested, we respond within 48 hours to keep your timeline on track.

Working Within Building Rules During Construction

Once approved, we comply with all building-mandated protocols: construction hours (typically 8am–5pm weekdays), elevator reservations for material delivery, debris removal scheduling, common area floor and wall protection, and noise mitigation during demolition phases. Our project managers coordinate directly with building supers and management companies.

Board-approved co-op renovation NYC — padded elevator and protected common hallway in a managed building

Common area protection and elevator reservations are set up before the first delivery — a condition of nearly every alteration agreement we submit.

Why Melani

Why Melani General Contractor for Your Co-op or Condo Renovation

Licensing, insurance limits, and documentation discipline are the first things a board and managing agent evaluate — and what keeps your project moving.

NYC Licensed General Contractor (#626219)

Our active license authorizes us to pull permits, supervise subcontractors, and maintain DOB compliance for residential construction across all five boroughs. Valid through December 2028.

22+ Years of Verified Experience

Since establishing operations in Park Slope, Brooklyn, we have completed co-op and condo renovations in pre-war walk-ups, post-war high-rises, and luxury buildings with documented references available upon request.

EPA Lead-Safe Certified (NAT-F277952-1)

Qualified to perform renovation work in pre-1978 housing stock, which includes a significant portion of NYC's co-op apartment buildings.

NYS Licensed Mold Remediation Contractor (#25-64SK4-SHMO)

Licensed by New York State to assess and remediate mold, so moisture damage found behind walls, ceilings, and old plumbing lines is corrected properly instead of covered up.

Fully Insured

Comprehensive general liability and workers' compensation insurance meets or exceeds the requirements of virtually every NYC co-op and condo board.

NYC Building Code Proficiency

Current knowledge of residential codes, co-op/condo alteration requirements, landmark preservation guidelines, and DOB filing procedures across different building types and management companies.

Process

Our Co-op and Condo Renovation Process

Five phases, in order — board approval and DOB permits cleared before demolition starts.

  1. 1

    On-Site Consultation

    We visit your apartment, take measurements, discuss your design goals, and review your building's specific alteration agreement requirements.

  2. 2

    Design and Estimate

    We prepare a detailed scope of work with an itemized cost breakdown including both construction and building-related administrative costs.

  3. 3

    Board Submission and Approval

    We prepare and submit your complete alteration agreement package, respond to any board revision requests, and coordinate with building management on construction logistics.

  4. 4

    Permits, Demolition, and Construction

    We file DOB applications, handle demolition, rough-in (plumbing, electrical, HVAC), and all finish work while maintaining full compliance with building protocols.

  5. 5

    Final Inspection and Closeout

    We coordinate DOB inspections, building engineer walkthroughs, common area restoration, security deposit return, and a detailed walkthrough with you before closeout.

Call (718) 283-4154 to review your building's alteration agreement before you submit.

Service Areas

Areas We Serve Across New York City

Our crews travel to job sites throughout all five boroughs from our Park Slope, Brooklyn headquarters. We maintain familiarity with neighborhood building stock, management companies, and building-specific requirements in each service area.

Reviews

See What Our Customers Have To Say

Free On-Site Estimate

Schedule Your Co-op or Condo Renovation Consultation

Ready to renovate your co-op or condo? Melani General Contractor provides detailed project estimates following on-site measurements and consultations. We review design preferences, budget parameters, building requirements, and timeline expectations before preparing formal proposals.

Call (718) 283-4154 to arrange your free on-site evaluation, or use the form below to request an estimate.

Free · No Obligation

Get Your Free Estimate

Service
Contact
Address
FAQ

Frequently Asked Questions About Co-op and Condo Renovation in NYC

Most co-op and condo renovations require 8–16 weeks from board approval through final inspection, depending on scope. Add 2–6 weeks for the board approval process itself. Full gut renovations of larger units may take 4–6 months of construction time.
Free On-Site Estimate

Ready to Renovate Your NYC Co-op or Condo?

We prepare the alteration agreement package, file the DOB applications, and run construction inside your building's rules — from first board submission through final inspection and deposit return.

  • Alteration agreement packages prepared and submitted
  • DOB filings, permits and final inspections managed
  • Work scheduled inside building-mandated hours
  • Elevator reservations and common area protection included