Step 1: Site Walk and Written Scope
We walk the property and document what is actually there. That means checking the electrical panel age, identifying plumbing stack material (cast iron or copper), and tracing structural load paths before a single number goes on paper. You get a written scope of work, not a verbal estimate.
