Custom Cabinet Design and Installation
We design and install custom kitchen cabinets sized to actual Queens footprints, including the galley layouts common in pre-war apartments, where every inch counts.
Kitchen remodeling in Queens means managing more than tile and cabinet selections. Pre-war buildings hide plumbing and electrical surprises behind the walls, and many co-ops require board sign-off before a single DOB permit gets filed. Melani General Contractor serves Queens property owners from our Brooklyn base at 343 4th Ave, and we manage board coordination, permit filing, and construction with one coordinated team.
Ready to remodel your Queens kitchen the right way? Let's talk about permits, timelines, and what your building actually requires.
Kitchen remodeling in Queens is more complicated than a simple cabinet swap, and any licensed kitchen contractor will tell you the same. You are dealing with co-op board alteration agreements, NYC Department of Buildings (DOB) permit requirements for any layout change, and a housing stock that runs from 1920s pre-war brick apartments in Astoria to post-war co-ops in Forest Hills to single-family homes in Bayside. Each property type brings its own approval track and its own set of surprises behind the walls.
Operating in NYC residential renovation for years, we handle kitchen remodeling in Queens and throughout all five boroughs from our licensed base at 343 4th Ave, Brooklyn, NY 11215. Mike Melani, a licensed general contractor with deep experience in co-op and pre-war work, guides every project. Client feedback reflects that track record.
The single most important thing to understand about work in these buildings is the order of approvals. In a co-op or condo, the board's alteration agreement must be approved before a DOB permit can be filed. That sequence, more than any material or finish decision, shapes your timeline. We explain it in full below and reference it throughout, because getting it wrong is the most common reason a Queens kitchen project stalls before demo day.
Your project is not the same job in every building. The scope depends heavily on what your building is made of, how old it is, and what your co-op board or the DOB requires before work starts. Replacing cabinets is a surface refresh. A full remodel means demolition, layout reconfiguration, rough-in work behind the walls, and new finishes from floor to ceiling.
The building type drives the rough-in approach. Pre-war apartment buildings commonly have cast iron plumbing stacks, galvanized supply lines, and shared risers that cannot be moved without board approval and DOB sign-off. Cloth wiring and undersized 60-amp or 100-amp panels are among the most common hidden conditions we find behind walls in 1920s and 1940s kitchens. Our Plumbing Services and Electrical Services account for those constraints from the start, so a corroded elbow or a dead circuit does not stall the project mid-demo.
Co-ops with board approval requirements add another layer, as noted above: the alteration agreement must clear before any permit is filed. Newer condos in Long Island City follow a different track, with modern risers but stricter building management rules. A full remodel typically covers:
Not sure if your co-op board requires an alteration agreement? We'll check for you and give you a written scope before your board meeting.
Custom cabinetry, countertops, tile, plumbing, electrical, and both approval tracks are managed by one team. We coordinate licensed plumbers and electricians under our direct supervision, and you do not need to manage the DOB or your board on your own.
We design and install custom kitchen cabinets sized to actual Queens footprints, including the galley layouts common in pre-war apartments, where every inch counts.
We source quartz, marble, and butcher block, coordinate templating directly with the fabricator, and set the finished slabs, keeping your timeline on track without a separate countertop sub you have to chase.
Backsplash tile, porcelain floor tile, and hardwood or engineered wood flooring are installed by our crew. Our Flooring Installation eliminates the coordination gaps that slow down multi-trade kitchens.
We relocate supply and drain lines, install new fixtures, and address cast iron or galvanized pipe sections common in pre-war stock. Our Plumbing Services cover everything found during the demo before new finishes go in.
We run dedicated circuits for refrigerators, dishwashers, and microwaves, and replace cloth wiring behind walls before any new finishes are installed. Older buildings often run 60-amp or 100-amp service, which requires a panel upgrade as part of a full remodel.
We file all required DOB permits and prepare co-op board alteration agreement documentation. As noted above, board approval precedes DOB filing, and we manage both tracks from day one so you are not caught between two approval processes.
Every project runs through four defined stages. We manage permits, board approvals, and construction under one coordinated schedule so nothing falls through the gap between approval and build.
We visit the property, assess the layout, locate the plumbing stack, and review electrical panel capacity. If the building is a co-op or condo, we flag alteration agreement requirements at this stage. You get a written scope of work before anything moves forward. Pre-war buildings may also need stamped engineer drawings before the board will accept the package.
We file the DOB permit application and prepare the full alteration agreement package for board submission where required. Physical work does not begin until both approvals are in hand. If you want to understand what triggers a permit requirement, our guide on Do You Need a Permit to Renovate covers the specifics.
Demo, rough Plumbing Services, rough Electrical Services, framing changes, cabinet installation, countertop setting, tile, and flooring all run under one coordinated schedule. For projects that extend beyond the kitchen, we handle the full Gut Renovation process the same way.
We complete all finished work, walk through a punch list with you, and schedule the DOB inspection closure. We pursue permit closure on every Queens kitchen renovation, though final sign-off is subject to DOB inspection scheduling.
Some problems are obvious. Others hide behind cabinet doors or inside walls until demo day reveals them. Here are the conditions that tell us a small refresh has crossed into full-remodel territory.
Swollen cabinet bases almost always mean water has been sitting there. In older apartments, supply lines under the sink have often never been replaced. The cabinet damage is visible; the plumbing problem behind it is not. Our plumbing team addresses both at the same time.
Two-prong outlets mean ungrounded circuits. In 1920s and 1940s buildings, those circuits are also frequently undersized for a modern refrigerator, dishwasher, and microwave running at once. That is an electrical problem, not a cosmetic one. Our Electrical Services cover panel upgrades and full circuit replacement as part of a kitchen remodel.
A galley that forces two people to work back-to-back, or a peninsula blocking the path to the refrigerator, is a functional failure. Appliances crowding the counter or blocking cabinet doors signal the footprint was designed for smaller equipment. Layout reconfiguration is a core part of the work, not an add-on.
Failed grout lets moisture reach the substrate. In Queens multi-family buildings with shared walls, that moisture can become a neighbor complaint and a building violation. Cosmetic patching does not fix a substrate that has already absorbed water. At that point, a full tile replacement is the right call, and it often makes sense to remodel the kitchen around it rather than patch around a bigger problem.
Queens has the most diverse housing stock of any borough in New York City. Pre-war brick apartment buildings in Long Island City sit alongside post-war co-ops and attached two-family homes in Howard Beach. Each building type carries its own infrastructure conditions, and those conditions directly shape the scope and cost of a kitchen renovation in Queens, NY.
Often, yes. In buildings constructed before 1940, cast iron plumbing stacks and galvanized supply lines are common, and moving a sink even two or three feet can expose corroded pipe sections that have to be replaced before any new finishes go in. Many of these buildings still run on 60-amp or 100-amp electrical service, which is undersized for a modern kitchen with a dishwasher, refrigerator, microwave, and range. Cloth wiring from the 1920s and 1930s is a fire risk and must come out when encountered. Melani coordinates the licensed electricians needed for panel upgrades and rewiring, keeping the schedule on track.
Post-war co-ops in neighborhoods like Kew Gardens and Woodside require alteration agreement approval before the DOB permit can be filed. That approval track can significantly extend the pre-construction timeline if it is not managed from day one. We coordinate stamped drawings, engineer sign-off, and board submissions together so nothing waits on a missing document.
Coastal humidity accelerates grease and moisture damage inside cabinets and wall substrates, especially in older buildings with no exterior wall available for a range hood duct. Recirculating range hoods and proper soffit ventilation are standard parts of our scope wherever exterior ducting is not feasible. If you want to understand how these conditions affect your overall budget, the guide on How to Budget for a Home Renovation covers the variables worth planning for.
Explore our other services in Queens.
We are a licensed and insured NYC Home Improvement Contractor (#2113624-DCA) and coordinate all required DOB permit filings. This helps minimize delays waiting on paperwork. We also know the alteration agreement process well, including the specific documentation packages that boards require before a permit can be filed.
Our crew handles demo, carpentry, tile and finishes; licensed plumbers and electricians handle regulated work under our direct supervision. This coordinated model minimizes gaps between trades waiting on each other. That coordinated model keeps projects on track, especially in older buildings where cast iron stacks or undersized panels surface mid-demo and need immediate decisions.
Customers describe Mike and the team as prompt, reliable, and producing work that is "done quickly and correctly" and impeccable. That track record covers Manhattan, Brooklyn, Queens, the Bronx, and Staten Island. Our General Contracting work spans apartment kitchens, co-ops, and gut renovations across all five boroughs.
We operate from 343 4th Ave, Brooklyn, NY 11215, and serve Queens on every licensed kitchen remodeling project we take on. Call us at (718) 283-4154 to get started.
Get a written scope before your board meeting so you walk in with numbers and drawings, not guesses.
Our general contracting and home renovation work is based in Brooklyn, but we serve property owners across all five boroughs. Wherever your project is, we bring the same permitting know-how, licensed trades, and direct oversight.
We manage every phase of your project, from DOB permit filing and co-op board coordination to rough-in work and final finishes, all from our licensed base at 343 4th Ave, Brooklyn, NY 11215. Whether your kitchen is in Bayside, Howard Beach, or Long Island City, one team handles the full scope. Read our guide on How to Hire a Licensed General Contractor if you want to know what to look for before you commit.
Ready to start your kitchen remodel in Queens? Contact our team at (718) 283-4154 and let's talk through your project.
Yes, any work that moves plumbing, relocates electrical circuits, or alters walls requires a permit from the NYC Department of Buildings (DOB). A straight cabinet swap or countertop replacement that leaves rough systems untouched generally does not. We file all required permits as part of your project scope. Skipping permits can result in stop-work orders, fines, and real problems when you go to sell. For a full breakdown, see our guide on Do You Need a Permit to Renovate.
A full kitchen remodel in a Queens co-op or condo can vary from permit approval to final inspection. Before physical work begins, allow time for pre-construction: permit filing, board review, and alteration agreement sign-off. Surface-level refreshes with no rough-in work move faster. The board approval track is the variable most homeowners underestimate.
Yes. We prepare the full alteration agreement package most Queens co-op and condo boards require, including stamped drawings and complete scope documentation. We coordinate directly with the managing agent so you are not chasing signatures between contractors and board members.
Costs vary based on scope, finishes, access, and existing conditions. A layout-change kitchen renovation in Queens, NY with new cabinetry, countertops, tile, and rough-in work will vary depending on finishes and the condition of existing plumbing and electrical. A detailed written scope and price is provided before any work begins. Our guide on How to Budget for a Home Renovation covers how to set realistic expectations.
Yes. The licensed plumbers and electricians we coordinate handle plumbing rough-in, fixture installation, electrical upgrades, and circuit work under our direct supervision. Melani coordinates the required licensed trades so you have one schedule and one point of contact.
We serve all Queens neighborhoods from our base at 343 4th Ave, Brooklyn, NY 11215, including Flushing, Sunnyside, Jamaica, Whitestone, and College Point, among others. Whether it is a small kitchen remodel or a full gut renovation of a post-war co-op, our team covers the entire borough. See our full General Contracting page for more detail.
Give Us a Call
Ready to move your Queens kitchen from a problem to a finished project? Call (718) 283-4154 or submit a project inquiry online. We manage permits, board coordination, rough-in, and finish work with one coordinated team, so you are not tracking down three different contractors while your kitchen is torn apart.